Practice Shoot at Doddershall 2nd June
A lovely morning’s shooting with some tricky stands. Thank you Brian, Dawn, William and the Team for setting up the Shoot.
There were some issues and complexities in setting up the shoot. One field was out of action because of the long grass. On the second field, we also had the power people handing off the pylons and also driving up and down the road. The shoot had to be stopped on a couple of occasions to allow vehicles to drive up the road.
The work on the power cables is to allow two new towers to be built where the cables cross over the proposed HS2 line. These towers will be taller than the existing towers, raising the height of the power lines over the to be built line.. The work where we are is necessary because the tables need to be taken down and placed on some temporary towers while the new towers are built.
Mark Hill 44
Adam Carter 36
Tod 36
John Ford 36
Wally 35
Logan 35
George 35
Nick 34
Pete Bickmore 33
Shirley 32
Bryan 29
John Whittey 29
Anthea 29
Bill 29
Geoff E 28
Jade 28
Paul B 27
John A 26
Joanna 25
Lana 24
Dawn 24
Steve B 24
Julian 21
Anthony 16
Graeme 14
Celia 11
Mike C 11